The construction of the MDAUK hospital in the Muzzaffarabad province has progressed since the last update. The pillars and roofs have been added to the thick steel and concrete foundations. Internal rooms, including operating theatres, x-ray room, wards and labs are in progress of construction.
The next stage is for the building to be made water tight. Then the furnishing of specialist equipment and IT work will commence. MDAUK visited the site during April during a personal visit to Pakistan, so fully appreciate the progress made under challenging circumstances for the MDAUK team.
Below are a selection of photos from the site and a video update:
[column size=”1/2″][video-item url=”http://www.youtube.com/watch?v=oOdyM8hClN0″ width=”400″ height=”250″][/video-item][/column][column size=”1/2″][Best_Wordpress_Gallery id=”3″ gal_title=”Hospital Progress – April 2012″][/column]